Dawlish Bypass – BR (W)
This route depicts the GWR's 1936 plan for a Dawlish avoiding line, which was a plan aborted because of world war two. It includes a proposed remodelling of Hackney, Newton Abbot, and Paignton to accept more trains. Other changes include adding extra detail to the existing Exeter to Kingswear route, as well as a track swap. This is a hobby project being worked on sporadically. Estimated release date: unknown